Close Menu
    Facebook X (Twitter) Instagram
    Afro ICON
    • Home
    • Free Gifts
    • Self Help
    • Make Money
    • Video
    • Hot Deals
    Facebook X (Twitter) Instagram
    Afro ICON
    Headlines

    Condra flourishes in steel shortage

    King JajaBy King JajaOctober 18, 2021No Comments3 Mins Read
    Condra flourishes in steel shortage

    South Africa’s current steel shortage is compounding an already serious obstacle to the efficient functioning of the subcontinent’s overhead crane market: declining service footprints

    There will be variable speed drives on the hoist and the long- and cross-travels, and control will be by pendant. (Image source: Condra)

    Condra has both the capability to manufacture and enough steel with which to do it. By contrast, other manufacturers are suffering material shortages exacerbated by a declining capability in terms of geographic reach, further lengthening lead times for this type of machinery. 

    Condra’s order book is benefiting, with the company continuing on time execution of orders at its factories in Johannesburg and Cape Town.

    Typical of these is one for a wide-span overhead crane secured by Cape Town subsidiary BB Cranes working in close cooperation with structural steel company Vlottenburg Engineering.

    Condra’s crane for this workshop will be an overhead electric overhead travelling machine with a span of almost 30 metres, allowing the full floor area to be serviced. The crane will work to maintain equipment brought in by Dolphin from oil exploration vessels and offshore oil and gas extraction platforms.

    During the tender phase of the contract, Condra proposed that the crane lifting height be maximised to 9.1 metres – almost the full height of the workshop walls – by designing girders with angled ends to match the slope of the workshop roof. Such a design allows the crane to be mounted with much of the machine’s volume occupying unused space within the roof itself.

    Crane capacity will be ten tons. There will be variable speed drives on the hoist and the long- and cross-travels, and control will be by pendant.

    Besides their angled ends, the 28.7-metre long twin girders have been designed with splices to comply with regulatory restrictions on the road between Johannesburg and Luanda, where load lengths cannot exceed 18 metres because of curves.

    Splice designs have become a common feature among Condra’s export orders. For the Dolphin Offshore Chandling crane, steel plates welded eccentrically to the four inside faces of the male box girder will result in a friction grip to reinforce girder strength and integrity beyond that delivered by the splice bolts alone. An internal box insert traversing the splice will deliver additional strength and rigidity, resulting in an almost seamless splice with a projected girder life in excess of 20 years. 

    Even though BB Cranes secured the Dolphin Offshore Chandling contract from Cape Town, Condra is executing manufacture at its Johannesburg works to reduce shipping costs.


    Source link

    BB Cranes Cape Town Chandling crane Condra crane market engineering Gas offshore Oil shortage South Africa steel
    King Jaja
    • Website

    Related Posts

    Protests erupt across major towns in Kenya

    June 26, 2025

    Boskalis coastal protection activities in Togo continue

    June 18, 2025

    Kenya protests erupt after activist Albert Ojwang dies in police custody

    June 10, 2025
    Leave A Reply Cancel Reply

    Facebook X (Twitter) Instagram Pinterest
    • Home
    • Privacy
    • Disclaimer
    • Contact us
    • Terms of Use
    © 2025 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.

    Go to mobile version