Close Menu
  • Home
  • Free Gifts
  • Self Help
  • Make Money
  • Video
  • Hot Deals
Facebook X (Twitter) Instagram
Trending
  • Gender roles in African societies
  • Empowerment of women in Africa
  • Barriers to Women’s Leadership in Africa
  • Representation of Women in African Governments
  • Impact of Women Leaders on African Development
  • Women’s Rights in African Politics
  • Success Stories of Women in African Leadership
Facebook X (Twitter) Instagram Pinterest YouTube TikTok
Afro ICONAfro ICON
Demo
  • Politics
  • Economy
  • Entertainment
  • Technology
  • Sports
  • Society
    1. Art and Culture
    2. Education
    3. Family & Relationship
    4. View All

    Filming what survives

    November 12, 2025

    ReBuilt Pavilion Debuts in Langa: A Living Showcase of Urban Innovation

    November 11, 2025

    AI Knowledge and Food Systems webinar

    November 10, 2025

    Beyond the Hits: How to Build Africa’s Sound as a Business

    November 9, 2025

    Olaudah Equiano: Lost grave of daughter of slave turned pioneer abolitionist found by A-level student

    November 10, 2025

    Tanzania: President Samia Hassan’s grip on power has been shaken by unprecedented protests

    November 7, 2025

    APC Defends $1Bn Lagos Port Investment, Dismisses Opposition’s ‘Sabotage’ Claim

    November 1, 2025

    Violent protests erupt as Tanzanian president nears election victory | Tanzania

    October 29, 2025

    Gender roles in African societies

    November 23, 2025

    Empowerment of women in Africa

    November 23, 2025

    Barriers to Women’s Leadership in Africa

    November 23, 2025

    Representation of Women in African Governments

    November 23, 2025

    Gender roles in African societies

    November 23, 2025

    Empowerment of women in Africa

    November 23, 2025

    Barriers to Women’s Leadership in Africa

    November 23, 2025

    Representation of Women in African Governments

    November 23, 2025
  • Lifestyle
    1. Foods & Recipes
    2. Health & Wellness
    3. Travel & Tourism
    Featured
    Recent

    Gender roles in African societies

    November 23, 2025

    Empowerment of women in Africa

    November 23, 2025

    Barriers to Women’s Leadership in Africa

    November 23, 2025
  • International
    • Asia
    • Europe
    • North America
    • Oceania
    • South America
Afro ICONAfro ICON
Home»Politics & Governance»Construction imminent for Terminal 5 at Port of Cotonou, Benin
Politics & Governance

Construction imminent for Terminal 5 at Port of Cotonou, Benin

King JajaBy King JajaJuly 24, 2021No Comments0 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Construction imminent for Terminal 5 at Port of Cotonou, Benin
Share
Facebook Twitter LinkedIn Pinterest Email

The start of construction works of Terminal 5 at the Autonomous Port of Cotonou (PAC) in Benin is in the offing after the award of a Procurement and Construction (EPC) contract for the project following an international call for tenders.

The contract was awarded by the Port of Cotonou Authority, which is in charge of operation and management of the port facility, to China Harbor Engineering Company LTD (CHEC) Group, which had in November 2019 won the geotechnical study contract for the same project.

Scope of the project

According to Van den Branden, the commercial and marketing director of the Autonomous Port of Cotonou, the content of the specifications indicates that CHEC, within the framework of the contract, will construct a new general wharf and form approximately 22 ha of new land in the sea from the current crossing.

Also Read: Cardinal Bernadin Gantin airport in Benin to undergo phase 2 rehabilitation

It will also build two new berths with a total of 550 meters, widen the southern breakwater by 350 meters in a bid to protect the port from the sea, demolish the existing eastern breakwater and dredge the harbor basin among other works.

The project is expected to be carried out within a period is 30 months, excluding the 8-month preparation period.

Part of US$ 449M master plan

The construction of the 5th terminal at the PAC is part of a US$ 449M master plan that was developed back in 2018 after 2 years of preliminary study.

In addition to the construction of terminal 5, this master plan provides for the extension of the basin and renovation of the North Quay, creation of a buffer car park at Zongo, construction of centralized access in the port as well as the development of a logistics zone within the port enclosure.

97

If you have a remark or more information on this post please share with us in the comments section below

Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
King Jaja
  • Website

Related Posts

Policing in Africa

November 21, 2025

Law enforcement in African countries

November 21, 2025

Challenges of policing in Africa

November 21, 2025
Leave A Reply Cancel Reply

© 2026 Afro Icon. Powered by African People.
  • Home
  • Privacy
  • Disclaimer
  • Contact us
  • Terms of Use

Type above and press Enter to search. Press Esc to cancel.

Go to mobile version